Process installation with tall stainless steel vessels, pipework and access platforms.
Stainless steel vessels, pipework and access platforms in a real process installation. Vessels and facility utilities are designed together.Photo: bbi-biotech

Define the interface at the consumer

Utility planning starts with the process and follows each required stream back to its source. Cooling needs heat duty, inlet temperature, permissible return temperature, required flow and pressure loss. Gas supply needs composition, reference conditions, minimum delivery pressure under load and maximum throughput. Electrical supply needs connection capacity, the actual load profile and behaviour during interruption. A list of connection sizes alone does not describe these requirements.

Define a physical delivery boundary, such as the isolation valve upstream of the reactor or the inlet to a local temperature-control circuit. Central utility readings cannot automatically be treated as conditions at that boundary. Pipes, regulators, filters and heat exchangers change the stream along its route. Facility engineering and the reactor supplier therefore need the same definition of the handover point.

Information required for a defensible utility specification
UtilityQuantity and conditionAdditional function
CoolantTemperature, flow, pressure and peak heat dutyReturn route, controllability and seasonal variation
Process gasComposition, purity, reference flow and delivery pressureFiltration route, switching and exhaust
SteamCondition, quality and maximum mass flowAir removal and condensate drainage
WaterQuality, temperature and demand profileStorage, distribution and backflow arrangement
ElectricityConnection, load profile and starting behaviourMonitoring and defined restart

Assign each figure a status: measured, committed specification or provisional assumption. A planned central-utility upgrade is not available capacity. Record unresolved requirements in a shared interface schedule with responsibility and a verification date. This helps identify before equipment purchase whether an apparent reactor limitation actually lies outside the equipment.

Process demand → Utility network → Interface → Demonstrated performance. trace the constraint.
Schematic decision and feedback relationship; not a specific equipment configuration. Scroll sideways on small screens or open to enlarge.

Separate peak capacity from consumption

Power describes instantaneous demand; energy is its time integral. A cooling duty of 20 kW for one hour corresponds to 20 kWh of heat. A continuous 2 kW duty over ten hours removes the same energy but requires different peak capacity. Heat-exchanger and pipe sizing often depend on the peak; consumption and cost also depend on duration. Both figures are needed.

A complete load profile includes preparation, filling, heating, holding, cooling, cultivation, harvest and turnaround. It need not assume a universal sterilisation sequence. Where the actual process uses thermal treatment, enter its specifically justified phases. Another configuration may instead depend on electrical temperature control, a prepared single-use vessel and different cleaning tasks. The utility profile follows the selected process arrangement.

A hypothetical culture needs 2 kW cooling for 12 h and then 6 kW for 8 h. Total removed heat is 12 · 2 + 8 · 6 = 72 kWh, and average power over 20 h is 3.6 kW. Cooling sized for 3.6 kW does not meet the later 6 kW phase. A thermal store could supply some of the peak, but only with sufficient capacity, suitable temperature and a demonstrated opportunity to recharge.

For several consumers, consider timing. Two reactors each requiring 6 kW at peak can demand 12 kW simultaneously. If peaks are deliberately separated, a smaller shared connection may suffice, provided the schedule is reliably maintained through engineering or operating arrangements. An assumed diversity factor is consequently not a physical constant. Derive it from the facility schedule and the deviation case that operation must accommodate.

Add reserve transparently. Measurement uncertainty, expected process variability and future expansion are different reasons and should remain visible separately. Multiplying blanket allowances at every planning level can create substantially oversized utilities that control poorly at low demand. The objective is a justified usable operating range, including critical boundary conditions.

Check cooling from the reactor to the return line

Heat must cross three successive boundaries: from culture to the exchange surface, through the wall or heat exchanger, and finally into a utility capable of carrying it away. A nominally sufficient chiller can therefore be paired with an undersized jacket or poorly circulated loop. Check both Q̇ = U · A · ΔTmean and Q̇ = ṁ · cp · ΔTcoolant. These relationships describe the same heat flow from different perspectives.

For a hypothetical peak case, remove 15 kW while cooling water warms from 12 to 17°C. With cp = 4.18 kJ kg⁻¹ K⁻¹, ṁ = 15/(4.18 · 5) = 0.718 kg s⁻¹, approximately 43.1 L min⁻¹. This is the flow requirement at the defined interface. It does not yet check pump head, pipe pressure loss, valve authority or distribution between parallel jacket channels.

Suppose culture remains at 30°C. Temperature differences at water inlet and outlet are 18 and 13 K. With idealised constant culture temperature and an appropriate countercurrent model, the logarithmic mean difference is (18 − 13)/ln(18/13) = 15.36 K. At U = 500 W m⁻² K⁻¹, required effective area is at least 15,000/(500 · 15.36) = 1.95 m². This is a teaching calculation; actual jacket flow and heat transmission must support the model assumptions.

If cooling-water inlet temperature rises to 18°C at unchanged flow, area and U, transferable duty falls to 10.0 kW in this simplified model. Return temperature becomes approximately 21.33°C, giving a temperature increase of only 3.33 K. Temperature effectiveness remains 5/18, so duty changes in proportion to the difference between culture and supply: 15 kW · 12/18 = 10 kW. Adequate flow cannot compensate indefinitely for lost temperature difference. Investigate this case early, particularly for low culture temperatures and warm summer utility conditions.

Measurement requires supply temperature, return temperature and actual flow together. One culture-temperature sensor reveals a process deviation but cannot distinguish its cause. High flow with a small water-temperature rise may indicate either low duty or restricted heat transmission. Low flow with a large rise may indicate a supply restriction. A complete heat balance and a suitable load test distinguish these explanations.

A local temperature-control loop can hydraulically separate the reactor from central utilities. It also adds a heat exchanger, pump heat and further temperature differences. Central supply must then be colder than the required local supply by an amount appropriate to the design. Do not omit that additional stage from a simplified assessment. The page on mixing, aeration and mass transfer develops the underlying process heat balance.

Check pressure loss and pumping power

A required cooling-water flow is achievable only if the pump supplies enough pressure difference at that flow. For a simplified circuit, add losses through piping, valves and heat exchangers. Actual operation lies at the intersection of pump and system curves. A pump with a high maximum flow may deliver considerably less at the required pressure. Maximum head and maximum flow are not simultaneously available operating conditions.

A hypothetical circuit requires 40 L min⁻¹ at 150 kPa pressure difference. Flow is 0.000667 m³ s⁻¹, giving hydraulic power Q · Δp = 100 W. At an assumed overall efficiency of 50%, electrical input is approximately 200 W. Efficiency is only a calculation assumption here; its actual value depends on pump type and operating point. Some electrical energy ultimately enters the system as additional heat and belongs in the energy balance.

Connecting a second consumer in parallel does not necessarily double flow through each consumer. Shared piping carries more water and may therefore develop higher pressure loss. With comparable turbulent flow, friction loss increases approximately with the square of flow. A shared section losing 20 kPa could therefore lose about 80 kPa at double flow. This estimate assumes unchanged geometry and similar fluid properties and should be replaced by the actual performance curve once available.

Practical verification measures flow and pressure difference for the intended combinations of consumers. Unbalanced parallel branches can leave a nearby consumer adequately supplied and a distant one under-supplied. Resolve the issue through hydraulic design and suitable distribution. Simply increasing the pump setpoint may otherwise increase energy use, noise and loading without adequately improving the disadvantaged branch.

Size gas supply for pressure, reference conditions and dynamics

Specify gas demand first as molar flow or as volumetric flow with unambiguous reference conditions. Litres per minute may mean a standard flow, a device flow referenced to another temperature or actual flow inside the reactor. For the same molar quantity, actual volume decreases at higher absolute pressure. Confusing these bases affects line velocity, sparging and exhaust balances. Conversion uses ṅ = pQ/(RT).

In a hypothetical facility case, four reactors each require up to 20 L min⁻¹ dry gas referenced to 0°C and 1.01325 bar. Simultaneous peak demand is 80 reference litres per minute, approximately 214 mol h⁻¹. At 25°C and 6 bar absolute, this flow ideally occupies about 14.7 L min⁻¹ in the supply line. Pipe assessment should therefore not use reference volume alone; pressure loss and local velocity require actual gas conditions.

Available pressure must overcome losses through distribution, regulators, filters, piping and sparger, plus vessel pressure and the liquid head. Check this at peak flow. A gauge may indicate adequate static pressure while supply collapses under load. For oxygen-enriched mixtures, balance each gas source and its simultaneous delivery requirement separately.

A receiver can buffer short demand peaks but cannot replace adequate average supply. For an idealised pressure vessel at constant temperature, usable gas amount is proportional to the difference between initial and minimum usable absolute pressure. Permitted pressure range and equipment suitability are defined through engineering design. This thermodynamic relationship is not an instruction for selecting or modifying a pressure vessel.

Switching behaviour belongs within supply assessment for extended cultures. A cylinder bank may contain enough total gas yet create a material pressure or composition disturbance during changeover. A practical test records flow, pressure and, where relevant, gas composition during the intended switch. Compare the result with the biologically tolerable interruption period. Operating logic should recognise whether a requested controller adjustment actually reaches the reactor as the intended gas flow.

Derive steam demand from heat duty

Steam may heat a jacket indirectly or serve a specifically engineered direct application. These uses do not necessarily require the same steam quality. Derive required quality from product contact, process requirements and the facility arrangement. A label such as clean steam does not replace a defined specification of properties to be demonstrated at the consumer. Similarly, a pressure reading does not establish temperature at every location being treated.

An initial indirect-heating calculation uses ṁsteam = Q̇/Δh. Heat duty Q̇ is in kJ s⁻¹ and usable enthalpy difference Δh in kJ kg⁻¹, giving mass flow in kg s⁻¹. The enthalpy difference belongs to the actual steam and condensate conditions. If only condensation enthalpy is used as a simplification, state that explicitly. Add pipe losses, heating of metal and non-ideal conditions where relevant.

A hypothetical vessel contains 100 kg of water-like liquid and 30 kg of stainless steel, both heated from 20 to 80°C. With cp,liquid = 4.18 and cp,steel = 0.50 kJ kg⁻¹ K⁻¹, heat demand is (100 · 4.18 + 30 · 0.50) · 60 = 25,980 kJ, or 7.22 kWh. Over 30 min, average heating power is 14.43 kW. A hypothetical 1 kW heat loss increases this to 15.43 kW.

With an assumed usable enthalpy difference of 2,100 kJ kg⁻¹, steam demand during heating is approximately 26.5 kg h⁻¹. Total use over half an hour is about 13.2 kg. These are heating examples only. They define neither a sterilisation cycle nor evidence of microbial inactivation. An actual treatment process needs its own temperature distribution, holding conditions and effectiveness justification.

Rapid heating requires effective heat transfer and condensate removal as well as sufficient steam supply. Startup may be considerably more demanding than subsequent holding. Check peak flow, average consumption and control range separately. The manufacturer's guide to steam consumption of plant items explains the engineering basis; its application examples each depend on their stated conditions.

Treat condensate and venting as part of heating

Condensation converts steam into liquid. If drainage is unsuitable, altered liquid levels or additional heat-transfer resistance can reduce usable heating performance. The return route is therefore part of the process function. Its pressure and layout affect the consumer directly. Under changing heat demand, the available pressure difference across drainage equipment may also change.

Non-condensable gases can alter the relationship between measured total pressure and steam temperature and impair heat transfer. Derive suitable venting from the actual geometry and verify its function. The manufacturer's explanation of steam quality describes these physical relationships. It does not establish a universal valve arrangement or sterilisation procedure for a bioreactor.

Reducing pressure can cause part of hot condensate to flash into steam. Depending on conditions, the return line therefore transports a two-phase mixture. Sizing it only from cold-water volume can misrepresent actual flow. Consider common return lines, elevation changes and simultaneous discharges together. Unusual noise or unstable heating calls for an engineering investigation, rather than a blanket increase in steam pressure.

Suitable clean condensate can return heat and treated water. Whether recovery is appropriate depends on possible contamination and the return system. Do not combine a potentially contaminated stream with clean condensate solely because it contains useful energy. The introduction to condensate recovery explains the energy basis; actual segregation and monitoring must suit the process.

Understand electrical demand and restart behaviour

Electrical connection capacity covers more than the agitation motor. Heaters, pumps, refrigeration, gas conditioning, controls and auxiliary equipment may run together. Connection design needs appropriate electrical specifications, while energy assessment requires actual consumption over time. A motor's stated mechanical output is not the electrical demand of the complete reactor.

A hypothetical reactor draws an average 1.2 kW during 8 h of culture, 5 kW during 1 h of electrical heating and 0.3 kW during 3 h of preparation and waiting. Electrical energy is 9.6 + 5 + 0.9 = 15.5 kWh. Average demand over twelve hours is only 1.29 kW, although the connection must support a period of at least 5 kW. Starting peaks and additional concurrent loads are excluded from this simplified example.

Functions respond differently to interruption. Controls may remain powered while agitation or pumps stop; a gas valve may move to a defined position. Understand this combination as the actual equipment state. An uninterruptible supply for the computer alone does not sustain a culture. Conversely, a documented short supply interruption may be manageable if the process and restart have been investigated accordingly.

Test restart deliberately: which setpoints remain, which pumps start automatically, how interrupted feed programmes resume and which clock governs the sequence. A catch-up feed bolus can differ biologically from resumed slow feeding. Define behaviour through the actual programme and appropriate functional checks. Safety functions and protective arrangements belong within the responsible engineering design rather than an improvised operator decision.

Plan water quantity and quality at the point of use

Water may be a raw material, rinse fluid, cleaning medium, coolant or feedstock for steam generation. Record these duties separately. A single consumption total conceals which quality must be available, when and in what quantity. Required quality follows from contact and intended use, rather than a blanket classification of the room.

A hypothetical daily requirement includes 300 L for medium, 500 L for a defined cleaning step and 200 L for further rinsing: 1,000 L in total. Preparing medium in 30 min requires 10 L min⁻¹; delivering 500 L over 20 min requires 25 L min⁻¹. Treatment capacity averaging 1,000 L per day therefore does not automatically meet demand without suitable storage or a longer schedule.

A storage tank smooths demand but creates requirements for quality preservation, usable inventory, circulation and refill time. Nominal tank capacity is not wholly available if minimum level or unusable residual volume applies. Plan with usable inventory and a time-dependent level balance. Several successive peaks can empty a tank even though each individual withdrawal would be possible.

For cleaning, assess return and disposal alongside fresh-water use. Effluent volume, temperature and composition can determine collection and treatment needs. Long lines and large auxiliary equipment can give a small reactor a substantial water requirement. The consumption boundary should therefore include the complete route actually cleaned. The page on resource and environmental assessment considers comparison per usable product quantity.

Assess exhaust, condensate and room loads together

Assess the exhaust route using actual wet gas flow at the outlet. Temperature, pressure, water vapour, carbon dioxide and possible aerosols distinguish it from dry inlet gas. A condenser changes that condition and creates another liquid stream. The positions of analyser, filter and condensate drainage therefore affect both measurement and operation. Evaluate these components as one complete route.

Increasing filter loading or accumulated condensate can raise backpressure. Gas control may compensate by using more of its available range. The visible process value initially remains normal while reserve declines. A suitable pressure-difference measurement or another justified functional monitor can reveal the developing restriction. Suitability depends on the actual filter and piping arrangement.

Distinguish heat released into the room from heat removed by cooling water. A local air-cooled unit releases process heat plus its own electrical losses to its surroundings. If installed in a small plant room, room ventilation must handle that load. Cooling that works on an open laboratory bench can perform considerably worse inside a confined enclosure.

Gas releases and potential process substances also belong in the site concept. Design room ventilation and monitoring for actual substances, quantities and local conditions. Neither the culture name nor a generic air-change figure is sufficient. This chapter provides the quantity and interface logic; the actual protective arrangement belongs with the responsible specialist design.

Organise layout, acceptance and changes

A useful layout supports operation as well as installation. Sampling, filter replacement, drive removal and medium connections require space. Piping must fulfil its intended cleaning, draining and maintenance functions. Floor area that appears free on a drawing may be occupied by hoses, mobile harvest containers or open service doors during operation. Walk through the actual movement of people and materials.

Before acceptance, define a testable requirement for each critical interface. Instead of saying that cooling must be sufficient, specify whether the required heat flow is achieved at the agreed load, supply temperature and simultaneous equipment use. Test gas supply at peak flow and during intended changeover. Compare water withdrawals with actual storage and refill behaviour. Assess electrical functions including the defined restart sequence.

Symptoms and useful next measurements
SymptomPotential constraintDiscriminating evidence
Cooling fails only in the afternoonWarm supply or shared loadUtility temperature and facility occupancy profiles
Gas pressure falls only at high flowPressure loss or source capacityPressures around relevant components under load
Heating fluctuates despite steady steam supplyVenting, condensate or controlTemperature distribution, return condition and valve history
Water is available early but not laterStorage depletionTime-dependent withdrawal and refill balance

Acceptance records measurement arrangement, uncertainty, conditions and deviations. A passed functional test is evidence for the case actually tested. If more reactors are connected later, supply temperatures change or new cultures impose higher loads, reassess the combined demand. Utility provision then remains a traceable prerequisite of the process instead of becoming visible only when the next production problem occurs.

Frequently asked questions

Is a chiller with a higher kW rating than reactor demand sufficient?

Only if heat can also pass through the jacket, local circuits and piping. Supply temperature, flow and exchange area must suit the load case.

Why are standard and actual litres not interchangeable?

Standard flow refers to defined temperature and pressure. The same molar gas flow occupies a different volume in a pressurised or warmer system. Document both conditions.

Should every device maximum simply be added?

Yes for peaks that actually coincide. Demonstrably separated loads may support a different design based on the operating schedule. A blanket diversity factor without that basis is insufficient.

Terms in this chapter

33 terms explained in the glossary