The functional unit determines the comparison

The functional unit describes the service assessed. For a bioprocess, it may be one kilogram of purified active product meeting specified quality at a defined handover point. For living cells, a specified number of functional cells may be more appropriate. A litre of culture medium is useful as an engineering consumption measure, but often does not represent the service the process exists to deliver.

This definition prevents misleading comparisons. Two reactors may use the same water per run while producing different amounts. A system using less energy per litre may perform worse per usable gram if titre or recovery is lower. Carry crude product, active fraction and subsequent losses into the reference output consistently. Do not silently treat a quality difference as merely an amount difference.

A hypothetical example has Process A using 100 kWh to deliver 1 kg usable product. Process B uses only 80 kWh but supplies 0.5 kg. Energy intensity is 100 and 160 kWh kg⁻¹ respectively. B appears more economical per run; A uses less energy for the same product service. This calculation assesses purchased energy only. It says nothing yet about water, materials or the environmental impact of each energy source.

Product function may also include shelf life and conditions of use. If products require different doses or storage conditions, comparing kilograms can be incomplete. Define the functional unit narrowly or broadly enough to answer the actual decision. An internal equipment comparison may use a clearly defined common factory gate; a comprehensive product comparison may require later life-cycle stages.

The European Commission's introduction to the PEF method explains the connection between product function, life cycle and impact assessment. A simplified operational comparison does not automatically meet every requirement of a formal PEF study. Name the method used and its limitations explicitly.

Function & boundary → Inventory → Impact assessment → Comparison. vary assumptions.
Schematic decision and feedback relationship; not a specific equipment configuration. Scroll sideways on small screens or open to enlarge.

Make the life cycle and exclusions visible

The system boundary determines which activities count. An operational inventory may cover electricity, water and consumables during use. A broader life-cycle assessment adds raw-material and equipment manufacture, transport, replacements and end-of-life treatment. Both can answer useful questions, but they must not be compared under the same label as though their scope were identical.

For bioprocesses, review at least the changed steps systematically: medium preparation, seed culture, cultivation, harvest, downstream processing, cleaning, storage and disposal. Include utility provision and manufacture of process aids. Replacing a reactor may leave downstream equipment unchanged while altering its consumption through different harvest volume or impurity burden. Unchanged downstream operation is therefore an assumption requiring assessment.

Comparing reusable and single-use process equipment requires both life cycles. Allocate reusable equipment manufacture over justified service, and record cleaning and any thermal treatment per use. For single-use systems, include component manufacture, packaging, preparation, transport and end-of-life treatment. Reusable supporting equipment in the single-use system does not disappear from the inventory.

Describe exclusions and their potential significance. If building services are identical for both options, a narrowly defined difference comparison may exclude the common load. That same load can still matter for absolute environmental intensity per product. If excluded, label the result as a correspondingly limited metric. A difference calculation and a complete product inventory answer different questions.

Set the boundary before comparing data and review it when new evidence appears. If an initially minor stage proves influential, include it. Such revision is part of sound analysis. Moving a boundary merely to favour a preferred option is not.

Inventory: establish quantities before impacts

The inventory records physical inputs and outputs: kilowatt-hours of electricity, kilograms of steam, litres of water, kilograms of raw materials, consumable counts and masses, and waste streams. Check these quantities before applying environmental factors. An incorrect water flow does not become trustworthy because a detailed impact factor is applied to it. Material balances and unit checks come first.

Data for an initial defensible process inventory
AreaPrimary dataBackground data
EnergyMeasured electricity and thermal supplyProvision of the relevant energy
WaterQuantity, quality, location and fateTreatment and regional effects
MaterialsMass, composition and replacement frequencyManufacture, transport and end-of-life treatment
ProductUsable quantity and quality-adjusted recoverySubsequent use and storage where relevant
WasteAmount, composition and actual treatment routeImpacts of treatment

Direct measurements are particularly valuable for processes under your control. Read a meter at the beginning and end of a defined phase; use an event log to explain additional consumers. If only a shared meter exists, justify assignment to individual processes. Nameplate power multiplied by culture duration can be an early approximation, but label it accordingly. Even short load measurements can substantially improve a crude constant-demand assumption.

Background data should match the relevant time, geography and technology. Electricity generation in another country or different polymer processing can alter the result. Database versions may also use different model boundaries. Record source, reference year, location, unit and known limitations for each dataset. A missing factor is a data gap, not a zero contribution.

The European Commission's data guidance distinguishes own-process and background data. A practical implication is to measure important controlled streams where possible and supplement external supply with documented suitable datasets. A formal environmental study additionally needs the data review required by its chosen method.

Distinguish energy, heat and climate impact

A kilowatt-hour of electricity is not interchangeable with a kilowatt-hour of delivered heat without further information. A heat pump, electric heater and steam-heated jacket use different supply routes. First record actual purchased or assigned energy in the inventory, then include its provision in the impact assessment. Heat removed from the process should not automatically be counted again as purchased energy.

A refrigeration unit with an assumed coefficient of performance of 4 ideally requires 10 kWh electricity to remove 40 kWh heat. Adding both 40 kWh of cooling duty and 10 kWh electricity as electrical consumption would be incorrect. Coefficient of performance also varies with temperature and load. This example explains the boundary; use measurements or performance evidence matching the operating point for actual values.

A simplified climate contribution can multiply energy by a suitable emissions factor: G = E · f. Energy E is in kWh, factor f may be in kg CO₂-equivalent kWh⁻¹ and G in kg CO₂-equivalent. The factor must identify included supply stages and greenhouse gases. Direct process-exhaust CO₂ is a different quantity from the complete climate contribution of energy provision.

Lower electricity consumption improves that contribution with other conditions unchanged. It does not prove lower total environmental impact if material or heat requirements increase substantially. The ranking of options may also depend on electricity supply. The later teaching comparison demonstrates this effect. Keep physical quantities and assessed contributions visible alongside each other.

The GHG Protocol Product Standard provides a basis for assessing product-related greenhouse-gas emissions across the life cycle. A climate inventory does not automatically assess every environmental effect. Water scarcity, resources and other impact areas require appropriate additional evaluation.

Separate water quantity, quality and impact

A water meter first provides a withdrawal quantity. It does not establish how much is consumed, returned or discharged elsewhere. A closed cooling loop can have high circulation and much smaller make-up demand. Counting each minute of circulation as fresh withdrawal creates a substantial overestimate. Conversely, fresh-water quantity alone can conceal treatment energy and effluent burden.

Distinguish withdrawal, treatment, use, return and final fate. Record temperature and relevant composition for rinse and cleaning water. Treating a contaminated stream is a different task from returning clean cooling water. Higher required quality can add generation, storage and distribution demands. Assess that chain rather than approximating environmental impact from the water price.

Location also changes interpretation. A litre withdrawn does not have the same water-scarcity significance everywhere. A defensible impact comparison needs suitable regional data and a clear definition of the water consumption considered. A global litre total remains useful as an inventory measure but is not a complete impact statement. Document the chosen method and geographical resolution.

When evaluating an improvement, check whether water is saved or merely shifted to another stage. More concentrated feed may reduce liquid entering the reactor while increasing dissolution, filtration or downstream requirements. Reduced cleaning can count as an improvement only when the required process function remains demonstrated. Resource optimisation and reliable operation must be achieved together.

Treat cleaning and thermal treatment as measured operations

Reusable equipment consumes some resources outside cultivation itself. Cleaning may require water, chemicals, energy and time; any specified thermal treatment adds further loads. Quantities depend on geometry, residues, piping and the demonstrated procedure. A universal water figure or generic sterile temperature-time condition would be inappropriate for comparison.

A hypothetical cleaning step heats 200 kg of water-like solution from 20 to 70°C. With cp = 4.18 kJ kg⁻¹ K⁻¹, Q = 200 · 4.18 · 50 = 41,800 kJ, or 11.61 kWh. This covers only sensible heat in the solution. Vessel metal, piping, losses, pumps and holding time are excluded. Assuming 80% useful heating efficiency would require 14.51 kWh input to supply that solution heat. Efficiency is only a calculation assumption here.

Recirculation or recovery can change demand if concentration, temperature and suitability are retained or deliberately restored. Record the fresh quantity actually displaced. Do not assume unlimited reuse over an arbitrary number of cycles. Ageing, carryover and monitoring may create additional streams or replacement events. Allocate those across the actual campaign.

A useful improvement experiment measures the complete step before and after modification. Compare consumption, duration and demonstrated cleaning outcome. Shorter pumping can save water or energy while increasing the chance of repeating the operation. Include repetitions and deviations in the assessment. Comparing only successfully completed standard cycles can underestimate actual resource demand.

Compare single-use and reusable systems without blanket conclusions

Single-use systems have visible material flows: bags, tubing, filters, connectors and sometimes integrated sensors are replaced. Manufacture and repeated reprocessing of reusable systems are less immediately visible. Visibility is not a measure of impact. A fair comparison records both forms of demand and assigns them to the same usable product service.

Determine consumable mass and composition as specifically as practical. A set need not contain only one polymer. Packaging, transport and preparation can add contributions. Claimed recyclability also differs from an actual recycling route. Use the realistic or demonstrated end-of-life route at the location. Evaluate an alternative route as a separate scenario.

For reusable equipment, service life and actual number of uses matter. An intensively used vessel spreads manufacture over more output than a rarely used one. Include replacement seals, sensors and other wearing parts separately. Planned lifetime is initially an assumption; maintenance records and actual utilisation can refine it.

Technical differences between systems can change environmental intensity. Different mixing capability, working-volume limits or harvest recovery alter output. Do not compare vessels alone while assuming identical process performance without evidence. Equipment selection and scale-up provide relevant engineering checks.

Bind the result to its conditions: process sequence, number of uses, electricity and heat supply, water requirement, output and end-of-life treatment. A justified preference may emerge for that case. It does not establish a universal vessel-volume threshold below or above which one system is inherently more environmentally favourable.

A hypothetical comparison whose ranking changes

The following simplified model considers only three climate contributions per run: electricity, an aggregated water-supply contribution and materials including assigned end-of-life treatment. Other contributions are deliberately excluded, so the result is not a complete life-cycle assessment. Both options produce 0.5 kg of equivalent usable product. All quantities and factors are invented teaching assumptions.

Hypothetical inputs for equal product output
Quantity per runOption AOption B
Electricity100 kWh70 kWh
Water supply500 L200 L
Assumed material contribution10 kg CO₂-equivalent30 kg CO₂-equivalent
Usable product0.5 kg0.5 kg

With an assumed electricity factor of 0.4 kg CO₂-equivalent kWh⁻¹ and water-supply factor of 0.001 kg CO₂-equivalent L⁻¹, A gives 100 · 0.4 + 500 · 0.001 + 10 = 50.5 kg CO₂-equivalent per run. B gives 70 · 0.4 + 200 · 0.001 + 30 = 58.2. Product-normalised results are 101 and 116.4 kg CO₂-equivalent per kg. Under these assumptions, A has the lower contribution within the limited boundary.

At an electricity factor of 1.0, results become 110.5 and 100.2 per run, or 221 and 200.4 per kilogram. B is now lower because electricity savings carry more weight. Equality occurs at 30 · f = 19.7, giving f = 0.6567 kg CO₂-equivalent kWh⁻¹. This crossover applies only to the invented inputs. It is neither a real location comparison nor a statement about a particular technology.

At a low factor of 0.05, contributions become 15.5 and 33.7 per run. The material difference matters more in relative terms. The model therefore identifies a background variable capable of reversing the ranking. An actual comparison needs suitable data for all important contributions. A small difference within substantial data uncertainty would not justify a strong general conclusion.

Water is assessed here only through a hypothetical climate factor. The calculation says nothing about water scarcity or other water impacts. The material contribution is also an assumed assessed impact, not material mass. Place these distinctions beside the table so that its simplicity does not imply greater coverage than the model provides.

Allocate shared equipment and repeated use transparently

Shared resources need a traceable allocation to the product service assessed. Buildings, water treatment and cooling circuits may support several processes. Occupied time, measured load or another justified driver may suit the question. Choose allocation explicitly and apply it consistently to both alternatives. It is not a retrospective adjustment for obtaining a preferred ranking.

A hypothetical device has an assumed manufacturing climate contribution of 2,000 kg CO₂-equivalent. Across 500 equivalent runs, this is 4 kg per run; across only 100 runs, it is 20 kg. The same equipment can therefore have different intensity per usable output when actual utilisation differs. Reconcile the assumed use count with service life and the occupancy schedule.

Simple allocation by run count may be unsuitable when runs differ substantially. A short experiment and an extended campaign do not use equipment in the same way. Time-based allocation may be an alternative but must also match actual use. Wearing components may depend more on events than hours. Different contributions may therefore use different justified drivers.

Handle shared burdens for coproducts transparently as well. A usable side stream can provide another function only when quality, amount and actual destination are considered. Do not credit an assumed displaced burden again elsewhere. Where several allocation methods are plausible, test whether the choice materially changes the conclusion.

Include recovery and successful runs in the environmental balance

A technically frugal run may have high environmental intensity if little usable product emerges. Measure quality-adjusted recovery as carefully as energy and water. Discarding defective fractions does not remove their upstream resource use; it reduces usable output. Analysing only successful runs would conceal this interaction.

A hypothetical set of ten runs creates 1,000 units of an assessed environmental contribution. At one kilogram usable product per run, intensity is 100 units per kilogram. If one run supplies no usable product after all resources have been consumed, divide 1,000 by 9 kg: intensity becomes 111.1 units per kilogram. The increase follows entirely from lost output.

A process change may consequently save resources per product through better reproducibility. That benefit needs credible evidence and should not be claimed from one successful experiment. Conversely, an additional test consumes resources but may prevent failed production. Include both effects within the same boundary. Product reliability is a material part of the balance rather than a separate topic unrelated to resource consumption.

Report uncertainty as part of the result

Uncertainty comes from measurement, allocation, background data and modelling assumptions. Keep these causes separate. Better metering can improve an uncertain electricity reading; uncertain future use count instead requires scenarios. An unknown end-of-life route needs location-specific evidence. Treating every uncertainty as the same blanket percentage can obscure the important questions.

For initial screening, vary central inputs individually, then test consistent combinations. Low electricity contribution with high material contribution may affect ranking differently from the reverse combination. Distinguish statistical uncertainty from deliberately chosen future scenarios. A scenario range is not automatically a confidence interval.

A result of 100 versus 102 units should not be described as a clear advantage when dominant inputs are only roughly estimated. Reporting similar performance under the investigated assumptions, with electricity provision controlling the ranking, may be more informative. A large difference that persists across plausible assumptions is stronger evidence. Even then, the conclusion applies to the assessed function and boundary.

Prioritise further data by combining influence with uncertainty. A small uncertain contribution need not be refined first. A large poorly known material or energy contribution may justify targeted measurement or supplier information. This makes environmental assessment a practical decision aid rather than an ever-growing list of equally weighted data gaps.

Move from an initial inventory to demonstrated improvement

A practical workflow starts with a clear question: which process change is being assessed, and which product service remains equivalent? Define the common boundary and relevant inputs and outputs next. Build an initial quantity inventory with data status, then add suitable background factors. Simply revealing overlooked side streams and lost product often provides substantial value.

The next step is a targeted comparison. For example, run two equivalent processes using the same handover point and fully measured preparation. Assess changes in recovery, culture time and turnaround alongside consumption. A new equipment option may initially require scenarios; replace these with actual measurements later. An early estimate should not remain in the report indefinitely as though it were measured fact.

Communicate the specific change, such as lower measured electricity per usable gram under defined conditions. Do not claim general climate neutrality or environmental superiority when only one contribution was assessed. Make the data date, exclusions and sensitivities easy to find. Do not combine distinct environmental effects into an intuitive overall score without a justified method.

Choose the next improvement from the dominant contribution. It might involve less unproductive idle time, better heat recovery, lower downstream loss or a suitable alternative material strategy. Verify the intervention using the same functional unit afterwards. This reveals whether fewer resources genuinely supply the same usable service or whether burden has merely shifted to another process stage.

Frequently asked questions

Is single-use inherently more sustainable than stainless steel?

No general conclusion follows without the process, utilisation, energy supply and end-of-life route. Compare equivalent usable output over the relevant complete life cycles.

Is a carbon footprint sufficient for environmental assessment?

It assesses climate impact within its boundary. Water scarcity, resources and other environmental effects may require additional information.

Can a hypothetical comparison be published?

It can explain the method when assumptions and exclusions are explicit. It is not evidence of the environmental performance of an actual product or technology.

Terms in this chapter

25 terms explained in the glossary